Our probes should be installed indoors within 1 meter away from the leakage source, within 2 meters outdoors, and the probes should be installed 30cm below the ceiling. The main machine is installed in the control room, and the number of installations should be selected according to the frequency and stay time of the leakage point personnel, and the newness of the production equipment, in order to achieve the best installation effect; To prevent radiation from high-temperature heat sources, excessive temperature will reduce the performance and service life of the sensor;
The part of the white metal housing where the probe sensor is located should face the ground;
For more specific instructions, please refer to the "Design Code for Flammable Gas and Toxic Gas Detection and Alarm in Petrochemical Enterprises SH3063-1999"