This page focuses on solution design for coal-to-oil applications with actionable Honeywell product guidance.
| Level | Example setpoint | Interlock |
|---|---|---|
| AL1 | H₂ 10%LEL / H₂S 10 ppm / CO 25 ppm | Audible-visual + ventilation |
| AL2 | H₂ 20%LEL / H₂S 15–20 ppm / CO 50 ppm | ESD pre-action, feed trip, evacuate |
CO and open-path on the structure; oxygen on its own loop. High alarm into the correct ESD cause-and-effect, not one plant-wide horn.